Commercial electrical job installing a Main Panel with 208/120 volt in Chicopee MA
2 Comments
Commercial electrical job with sub panels bringing in 480/277 volt to the panel on the right with a transformer in the middle giving us 208/120 voltage to the panel on the left in Springfield MA
Building remodel doing a 600 kcmil wire pull feeding a second floor electrical sub panel in Springfield MA
WEST SUFFIELD October 28 - Tomorrow is 5 years since the rare "white Halloween" of Storm Alfred or commonly referred to as Snowtober. Which left 3.2 Million residents and businesses in 12 U.S states and 3 Canadian provinces with power outages that lasted as long as 11 days and ended with the resignation of the chief operating officer of Connecticut Light & Power.
|
BLogCategories
All
Archives
May 2019
|